Fort Shafter – Command & Control Center
Systemcenter Project # 4718
The Systemcenter was awarded the contract to install the new Fort Shafter Command and Control Center Phase One FF&E. Featured products include Haworth raised access flooring (TecCrete) and KI fixed seating. Ft Shafter opted to use and take advantage of the incredible versatility provided by Haworth’s TecCrete raised access flooring. The raised access flooring was installed to provide 5 tiers of risers for KI’s fixed seating. The TecCrete flooring allows the original slab to remain in place allowing for potential future re-purposing of the space. The flooring also allows all power and data to be run through the floor, as well as providing a plenum for HVAC.